
Most SMT downtime is not caused by defects—but by slow or unclear recovery.
A well-designed recovery strategy can save more uptime than buying faster machines.
Recovery includes:
NG routing
Review decision
Restart logic
No standard NG flow
Over-engineering review
Operator confusion
Separate review from production
Use offline review where possible
Define clear stop/go rules
Buffers without recovery logic only delay problems.
Mean recovery time
Line restart success rate
Repeat NG frequency
→ Buffer Strategy
→ AOI Optimization
→ Inspection Optimization Pillar
Previous article:Inspection Buffer Strategy – Preventing SMT Line Blocking
Next article:no more